Dorr-Almas
engineers and technician
can dimension, install, carry out repairs, modify and load
testing of installed power equipments.
Team Experience:
LV and HV equipment
Two-Phase and Three Phase Circuit.
Generator Power starting from 8.5 KW to 2263 KVA
AC-DC Current Converter Circuit
Batteries
Electrical Power Work Procedure:
Electrical power survey
After calculating the electrical power to all equipment
planned to be used in the site. engineer can provide the
exact metering .
Electrical Power Installation
o Electrical and grounding distribution for shelter, tower
control panel, racks, Switches, IOU and Other equipment.
o Lightning protection for Tower
o Roof Top PolefTower Obstruction light as per FAA/IACO
regulations
HVAC (Heating,
Ventilation and Air conditioning)
o Dorr-Aimas provide perform HVAC & FM200 fire fighting
design and recommendation for any upgrading required for
existing cooling systems and HVAC control system.
o Site survey including survey for existing cooling system
using the best measurement tools to get accurate reading
o Installation of AIC unit "Split , Package, Windows has
nominal cooling capacity from 12000 Btu/h to more than
120000 Btu/h and FM200 fire fighting system.